OVE
as accredited Inspection Body according to EN 45004 conducts
factory inspections at manufacturers of certified products.
Certificates
issued by OVE attest the conformity of the tested specimen
and of all products from the running production. To ensure
that all certified products are identical, within accepted
manufacturing tolerances, to the samples against which the
Certificate was granted, OVE verifies during frequent inspection
visits the production control routines for adequacy.
Most
Certification Bodies require factory inspection in connection
with their certificates. Under the CCA procedures, normally
the Certification Body where the manufacturer´s production
facilities are located carries out the inspection. Therefore,
OVE performs inspections in Austria, first and foremost for
OVE Certificates, but also at the premises of Austrian manufacturers
on behalf of other CCA bodies (VDE, KEMA, IMQ, BEAB, SEMKO,
SEV, FIMKO, CEBEC, LCIE, NEMKO, FIMKO, AENOR, DEMKO). In the
same manner, OVE requests other CCA bodies to perform inspections
outside of Austria in order to keep the expenses for the manufacturer
at a minimum.
In
addition to inspections requested by CCA members, OVE has
agreements with Certification Bodies outside of Europe and
conducts factory inspections on behalf of these bodies according
to their procedures (UL/United States, JET/Japan, SABS/South
Africa, UCIEE/Brasil, KTL/Korea, IRAM/Argentina, etc.).
| Benefits
for the customer |
 |
The
Low Voltage Directive requires among other things the manufacturer
to have an internal production control. In view of this, certification
by OVE is a big help for manufacturers as the OVE Mark indicates
not only the compliance of the product with European Standards
but also that the relevant production processes are assessed
by an independent body. At the same time the manufacturer/licensee
is provided with supporting documents for his technical files
to declare the compliance with the relevant European Directives
and to apply the CE-Marking on his products with complete
confidence.
| Factory
inspection procedure |
 |
For
initial applications and if there has been no previous inspection
performed at the manufacturer´s facilities in question, a
pre-licence factory inspection has to be carried out. Therefore
a questionnaire (Form CIG 022, Section B) will be forwarded
to the applicant and has to be filled out by the manufacturer.
This document contains a number of questions for the company
concerning its location, contact person, number of employees,
product category, materials, components and other parts that
become part of the product, information about the company's
quality system and which factory tests are carried out. As
soon as this questionnaire has been received and evaluated
by OVE´s Factory Inspection Department, the manufacturer will
be contacted to schedule the pre-licence factory inspection.
If factory inspection has already been performed by another
CCA body for the product category in question, the inspection
will be accepted by OVE and a copy of the relevant inspection
report has to be forwarded to OVE.
Subsequently,
manufacturing locations of certified products will be inspected
normally once per year unless otherwise indicated to ensure
that the necessary routines and procedures are being maintained
at an acceptable standard. Should inspection prove to be unsatisfactory,
the certification of products may be suspended until such
time as procedures have again been found to be satisfactory.
However, production under the certification scheme may, in
some cases, be allowed to continue whilst corrective action
is taken provided adequate written assurances are given by
the licensee.
During
routine inspections of a manufacturer's premises/factory location,
sample(s) of certified products and/or assemblies and components
may be selected for re-examination testing to verify compliance
with the relevant standard.
Special
inspections may be deemed necessary when a large number of
minor findings and/or major findings are found to the extent
that conformity of the product with the standard may be endangered.
| Requirements
for the manufacturer |
 |
OVE´s
requirements for production control are in line with the harmonized
CCA procedures. Compliance with these requirements will be
verified during frequent inspection visits.
Reference
documents:
| CIG 021 |
|
Factory
Inspection Procedures - Harmonized Requirements (download
Document) |
| CIG 022 |
|
Pre-Licence
Factory Inspection Report (MC-6) |
| Section
A: |
|
Inspection
request (to be completed by the certification body requesting
the visit) |
| Section
B: |
|
Questionnaire
(to be completed by the manufacturer) |
| CIG 023 |
|
Factory
Inspection Report |
| CIG 024 |
|
The
Conduct of Factory Inspections |
| OVE-P Series |
|
Requirements
for Routine Tests and Product Verification Tests |
Upon application
the manufacturer will be provided with all necessary documents.
| Further
information |
 |
Factory
inspection and production line assessment can also be ordered
as an additional service by any manufacturer proving transparency
and high level internal production control to his clients.
If you
have any further questions concerning factory inspection procedures
please contact Mr. Thomas NEUMAYER:

|